Maintenance Planning and Scheduling
Good planning is what separates a maintenance department that controls its workload from one that lives in permanent reaction.
- Next session
- 28 Sep to 2 Oct 2026
- Venue
- Johannesburg
- 5 day programme
- FromR18,000
Process piping carries the hazards of a plant from one vessel to the next, so how it is designed decides how safely the plant runs. This programme works through the requirements of the ASME B31.3 process piping code, from material choice and wall thickness to flexibility, supports and testing. Delegates leave able to read a piping specification with confidence and to check that a design meets the code.
Ready to book? Secure your place on this programme.
Register for this courseMechanical, piping and project engineers, designers, and inspection staff who specify, review or verify process piping in oil, gas, chemical and utility plants.
| Dates | Venue | Days | Fee | Calendar | Register |
|---|---|---|---|---|---|
| 28 Sep to 2 Oct 2026 | Johannesburg | 5 | R18,000 | Register | |
| 5 to 9 Oct 2026 | Cape Town | 5 | R18,000 | Register | |
| 12 to 16 Oct 2026 | Durban | 5 | R18,000 | Register | |
| 19 to 23 Oct 2026 | Pretoria | 5 | R18,000 | Register | |
| 26 to 30 Oct 2026 | Nairobi | 5 | US$1,800 | Register | |
| 2 to 6 Nov 2026 | Dar es Salaam | 5 | US$1,800 | Register | |
| 9 to 13 Nov 2026 | Lusaka | 5 | US$1,800 | Register | |
| 16 to 20 Nov 2026 | Harare | 5 | US$1,800 | Register | |
| 23 to 27 Nov 2026 | Accra | 5 | US$1,800 | Register | |
| 30 Nov to 4 Dec 2026 | Lagos | 5 | US$1,800 | Register | |
| 7 to 11 Dec 2026 | Dubai | 5 | US$1,800 | Register |
Fees are per delegate. South African venues are priced in rand; other locations and online in US dollars. Fees exclude 15% VAT where applicable. Group bookings of three or more delegates from the same organisation qualify for a reduced rate; contact us for a quotation.
Good planning is what separates a maintenance department that controls its workload from one that lives in permanent reaction.
Repeat failures are expensive, and most of them are preventable once the real cause is understood.
A shutdown that overruns costs production, credibility and budget, usually in that order.